- Apr 1, 2005
- 41,363
- 74,893
I am interested to see it in operation too, as I am not sure if the quoted 30mins related to rolling the turf pitch in and out or if it included all the work needed to get both pitches 'match ready'... you have the great big NFL goal to put up and take down and i bet the grounds men will be out with their forks having a good prod! in reality i would guess an hour or more from true start to finish but will be super impressed if its the 30mins THFC have been talking about.
Wont the front row of seats of the south stand need to be removed before the pitch is retracted, or was i dreaming again?